Umusadege Field

Production

Umusadege Field

Niger Delta, Nigeria
Active Production
Project Status
2008
First Oil
45,000 bopd
Export Capacity
2 Independent Pipelines
Export Routes

SunTrust Atlantic and its JV partner produced first oil from the Umusadege Field in 2008. A multi-well drilling campaign is ongoing, and we are actively working to mature other drilling prospects within the Umusadege field towards increasing production.

The Umusadege Field exports crude oil via two export pipelines, the TransForcados Pipeline, connected by the Umugini Pipeline, and the AGIP Export Pipeline (Brass River Terminal). The Umugini Pipeline, commissioned in 2014, is a 51.4km × 12″ pipeline with a design capacity of 45,000bopd per day, co-owned by SunTrust Atlantic.

The JV's ability to export oil from two independent oil export terminals significantly reduces the risk of production shut-ins due to pipeline downtime.

Umusadege Field
Field Status
Active Production

For the latest updates on this field's operations, visit our Newsroom.

View latest news

Partner with us

Building Africa's energy future, together.

From technical partners to host communities, we collaborate with organizations that share our commitment to safety, integrity and long-term value.

SunTrust Atlantic